With 6th gen 4Runners starting to arrive & deliveries underway, a general delivery / shipment timeline should be helpful for future owners. This is what I've learned and experienced after buying my past Toyotas and also from what I've seen others experience with their purchases.

Delivery timing varies depends on the geographic location of the port and dealership, but on average here’s a general timeline.​
Shipping (via RORO - Roll-on / Roll-off cargo ship) of 4Runners from Tahara plant in Aichi Japan to a US / NA port takes 2-4 weeks, depending on which destination port.​
  • West coast ports take 15-20 days
  • East coast ports take 25-30 days
Processing / inspection at the port takes a few days to 1 week.​
Delivery to dealership takes from a few days to a couple of weeks depending on distance of the dealership from the port.​
Total time from build to delivery is generally 4-6 weeks.​
Here is an informative video showing what happens at Toyota ports once the vehicle arrives:​
From Ship to Showroom - Toyota Logistics at the Port of Long Beach Delivers
 

et2041

TRD Pro
Well-known member
First Name
Eric
Joined
Jul 27, 2024
Threads
2
Messages
81
Reaction score
55
Location
Wisconsin
Vehicle(s)
2012 Toyota 4runner Trail Edition: 2025 4runner TRD Pro in Black ordered.
How many days does it take to build a 4runner at the factory?
 
OP
OP

Henry

TRD Pro
Well-known member
First Name
Henry
Joined
Feb 7, 2024
Threads
29
Messages
125
Reaction score
171
Location
Southwest
Vehicle(s)
2018 4runner; 2025 TRD Pro on deposit
Assembly itself takes about 1-2 days to fully assemble a 4Runner on the production line.

But the total manufacturing process from raw material to fully assembled 4Runner takes up to 1 week (this includes stamping, painting, component manufacturing, etc.)
 

Mad Ghost

TRD Off-Road Premium
Active member
First Name
Justin
Joined
Jan 31, 2025
Threads
2
Messages
41
Reaction score
36
Location
Wylie Texas
Vehicle(s)
4Runner ORP and Avalon
I'm in DFW Texas and tracking shows a build date of Dec 23rd and estimated arrival between Feb 15 and March 8. However last scan was in Arizona on February 8.
 
 